Skip to main content
A floating viewing deck beside the Lighthouse
IDEA

A floating viewing deck beside the Lighthouse

A small wooden deck extending out over the water next to the Lighthouse, perfect for sunsets, photos and a few quiet minutes above the sea. A small, inexpensive project with a big aesthetic payoff at the city's most photographed spot.

  • Construction of a sealed, submerged viewing chamber made of marine-grade reinforced concrete, anchored to the seabed at the tip of the pier.
  • Submerged access staircase with non-slip steps (WPC deck or stainless steel grating) for safety.
  • Installation of multiple, ultra-resistant acrylic or laminated glass panels (tens of centimeters thick) for panoramic seabed views.
  • Installation of powerful underwater LED floodlights around the chamber perimeter to illuminate the seabed for nocturnal observation.
  • Complete redevelopment of the pier surface with a wide synthetic deck (WPC deck).
  • Installation of tall, sturdy railings (AISI 316L stainless steel) along the entire length.
  • Access to the underwater chamber via staircase and elevator (100% accessible for disabled persons).
  • Ventilation, air conditioning, and automated external glass cleaning systems.
  • Installation of a high-resolution underwater camera connected to a live streaming feed on the city's official website.
  • A unique photo spot.
  • An immediate aesthetic upgrade.
  • Low implementation cost.

Got an idea too?

Log in with your email to submit your own idea.

0 supporters since 05/09/2026

Suggested Location

On the existing concrete/stone pier (breakwater) at Argo Park.

Implementation Cost

€300,000 - €500,000

Cost Breakdown

  • Design, Port/Subsea Studies & Permitting: €30,000 - €50,000
  • Construction & Installation of Submerged Concrete Structure: €120,000 - €180,000
  • Specialized Acrylic Glazing & Waterproofing Systems: €80,000 - €120,000
  • Surface Redevelopment (WPC Deck, Railings, Lighting): €50,000 - €80,000
  • Underwater Lighting, Ventilation, Elevator & Cleaning Systems: €20,000 - €50,000
  • Contractor Profit, Contingencies & VAT: €20,000 - €50,000

Possible Funding Sources

Municipal budget

Durability Rating

High

Vandalism/Damage Risk Rating

Low

Construction Materials

Teak wood, stainless steel connectors.

Maintenance Requirements

Varnish maintenance every 2 years.

Suggested By

Ομάδα ALX.GR